Aerotropolis West — compute, robots, power
Kemps Creek / Bradfield / Badgerys Creek employment lands beside Western Sydney International. Grid conversation via Sydney West. Recycled water, not drinking supply. Proposed Phase 1 envelope 150–250 MW is a planning range, not a contracted load.
- 01 Compute — Grok-class node, southern inference/training. Cooling from recycled wastewater. On-site storage + contracted new generation. Underwrite the wires.
- 02 Robotics — Optimus-class embodiment hall. Australian heat, dust, distance. Human veto. Logged, reversible. No public stunts.